Home
Projects
MacArthur Middle School
MacArthur Middle School
Renovation Anne Arundel County Public Schools

MacArthur Middle School

Renovation Anne Arundel County Public Schools

The design team worked closely with James Posey Engineering on this project to coordinate over 210,000 square feet of renovations, in nearly every room of the facility. The scope of work for this project includes a full systematic replacement of the heating and cooling systems, and complete window and ceiling replacement throughout MacArthur Middle School, a two-story facility located on Fort Meade. The firm performed site visits, field verification of all existing ceilings and openings, and reviewed existing drawings to determine the appropriate design direction for window and ceiling replacement throughout the entire building. Roof replacement, patching, and repairs corresponded with the HVAC renovations. The firm also worked with the county to determine the appropriate fire and life safety solutions, as the existing building is not equipped with a sprinkler or up to current code.

Project Details

Project Market(s):

Education

Project Service(s):

Architecture

Professional Credits:

James Posey Engineering (Prime Engineer)

Location:

Fort Meade, Maryland 

Size:

210,000 SF

Completion Date:

2016

Sector Lead(s):

Christa Kerrigan, AIA, LEED AP BD+C
ckerrigan@michaelgraves.com

Learn more about MGA&D's team or just ask us a question.